Reviewed by the Benton Metal Depot team · Updated
A good horse barn gives you shelter, storage and enough room to handle everyday chores without everything feeling crowded. Benton Metal Depot supplies agricultural building materials for properties in Philip and nearby communities, with a lead time of 1 to 2 weeks. Knowing this gives you a starting point for planning the rest of the project.
Key Points
- ◦Benton Metal Depot is approximately 164.6 miles from Philip.
- ◦In Philip, a permit from Charleston County Building Inspection Services is required once the barn exceeds 120 square feet.
- ◦Current lead time for horse barn materials to Philip is 1 to 2 weeks.
- ◦Applicable Benton horse barn packages use 29-gauge and 26-gauge Rib panels metal panels.
- ◦The current local setback for a horse barn in Philip is Detached accessory structures must comply with all applicable setback standards of the Zoning and Land Development Regulations, but the specific side/rear footage by district was not retrieved from available excerpts..
At a Glance
| Permit threshold |
120
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Detached accessory structures must comply with all applicable setback standards of the Zoning and Land Development Regulations, but the specific side/rear footage by district was not retrieved from available excerpts.
As of 2026 · Source |
| Wind load zone |
Charleston County is a Coastal High-Hazard Area — secondary sources cite design wind speeds in roughly the 130-150 mph range (ASCE 7-16/7-22, Risk Category II), with the wind-borne debris region extending about 1 mile inland from the coast. Exact figure depends on precise parcel location and adopted county wind map; must be confirmed with a SC-licensed engineer or the county building official.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib panels
As of 2026 · Source |
| Drive time from Statesboro |
213
As of 2026 · Source |
Permits & Setbacks in Charleston County
Barn placement is something to figure out before the ground is cleared. If you're planning a horse barn in Philip, contact Charleston County Building Inspection Services about the local requirements. The permit rule applies once the building exceeds 120 square feet, and the current setback is Detached accessory structures must comply with all applicable setback standards of the Zoning and Land Development Regulations, but the specific side/rear footage by district was not retrieved from available excerpts.. You should also check whether any additional rules apply to keeping horses on the property before committing to a building location.
Delivery to Philip
Don't wait until the barn materials are ready to start thinking about the site. Customers in Philip are currently looking at 1 to 2 weeks from Statesboro. Benton Metal Depot is about 164.6 miles away. Use that time to coordinate contractors and prepare the area where materials will be received.
Representative product photo — a Charleston County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
Can I add a tack room and wash area to my horse barn?
Yes, those spaces can be included in the overall barn plan when the layout and building dimensions allow. A tack room needs practical storage, while a wash area needs suitable drainage and water access. Decide where both belong before choosing the final building size, since they can take up space you might otherwise assign to stalls or aisles.
How many colors are available for a horse barn?
Benton's applicable horse barn materials are available in 7 colors. You may want the barn to match existing buildings, or you may prefer a traditional farm-building appearance. Color is worth choosing early, especially if the roof and walls will have different finishes. Confirm the available combinations before finalizing the material order.
Is a metal horse barn too hot for Georgia summers?
A metal roof or wall system doesn't determine barn comfort by itself. Ventilation, insulation where appropriate, shade and the overall building design all affect interior conditions. In Philip, plan for the region's warm, humid weather. Horses need adequate airflow and access to fresh water, so those requirements should be part of the design from the beginning.
Do I need a permit for a horse barn in Philip?
The requirements for Philip are handled by Charleston County Building Inspection Services. Currently, a permit is required once the barn exceeds 120 square feet. Agricultural use doesn't automatically mean a building is exempt from every local rule. Check zoning, setbacks and any other requirements for your property before beginning site work or committing to the barn's location.
How wide should the aisle in a horse barn be?
The aisle needs enough room for horses and handlers to move without crowding doors, corners or stored equipment. Think about how horses will enter and leave stalls, whether you'll move wheelbarrows through the barn and how daily cleaning will work. Have the layout reviewed for safe horse handling rather than choosing an aisle width based only on available space.
What size should horse stalls be?
Stall size depends on the horse, including its height, build and how comfortably it can turn around and lie down. A layout suitable for one horse may not work for a larger animal or a mare with a foal. Have an experienced equine facility designer or qualified professional review the stall dimensions before construction.
Can I store hay and feed inside my horse barn?
You can plan storage areas for feed and supplies, but hay storage deserves special attention because of fire risk, moisture and dust. Many barn designs separate bulk hay from horse housing. Think about how feed will be delivered, kept dry and accessed every day. Review the storage arrangement with a qualified equine facility professional before construction.
How close can I build a horse barn to my property line?
The current setback in Philip is Detached accessory structures must comply with all applicable setback standards of the Zoning and Land Development Regulations, but the specific side/rear footage by district was not retrieved from available excerpts., subject to the requirements of Charleston County Building Inspection Services and your property. There may also be separate rules affecting livestock buildings or where animals can be kept. Check those requirements before marking the barn location, particularly if neighboring homes or property boundaries are nearby.
Definitions
- ◦ Tack Room
- A dedicated area for storing saddles, bridles, grooming supplies and other horse equipment.
- ◦ Stall Partition
- A wall or divider separating one horse stall from another or from an adjacent area.
- ◦ Ridge Vent
- A ventilation opening near the roof peak that allows warm, moist air to escape when designed as part of a functioning ventilation system.
- ◦ Condensation
- Moisture that forms when humid air contacts a sufficiently cool surface. Poorly managed condensation can cause damp conditions inside a barn.
- ◦ Feed Room
- A space used to store and organize feed and feeding supplies, with appropriate protection from moisture and pests.
- ◦ Post-Frame Construction
- A building method that uses regularly spaced structural posts or columns to support the roof and walls. It's commonly used for agricultural buildings.
- ◦ Eave Height
- The height of the barn's exterior wall where it meets the lower edge of the roof.
- ◦ Center Aisle
- A passageway running through the barn, usually with stalls or other rooms along one or both sides.
- ◦ Dutch Door
- A door divided into upper and lower sections that can open separately. Some horse barns use them for stall or exterior access.
- ◦ Panel Gauge
- A measurement related to sheet-metal thickness.
Philip, Charleston County — At a Glance
- Permit Authority Name
- Charleston County Building Inspection Services
- Permit Authority Url
- https://www.charlestoncounty.org/departments/building-inspection-services/
- Permit Threshold Sqft
- 120
- Setback Feet Side Rear
- Detached accessory structures must comply with all applicable setback standards of the Zoning and Land Development Regulations, but the specific side/rear footage by district was not retrieved from available excerpts.
- Wind Load Zone
- Charleston County is a Coastal High-Hazard Area — secondary sources cite design wind speeds in roughly the 130-150 mph range (ASCE 7-16/7-22, Risk Category II), with the wind-borne debris region extending about 1 mile inland from the coast. Exact figure depends on precise parcel location and adopted county wind map; must be confirmed with a SC-licensed engineer or the county building official.
- Coastal
- 1
- Drive Miles
- 164.6
- Drive Minutes
- 213
- Nearby Towns
- Palmetto Fort, Porcher Bluff, Whitehall Terrace, Mount Pleasant
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib panels
- Color Count
- 7
Why Benton Metal Depot
A horse barn involves more planning than choosing a roof and four walls. You have to think about the animals, the people caring for them and how the building will be used every day. Benton Metal Depot supplies metal panels, trim and related building materials for agricultural projects, allowing customers to coordinate those exterior materials with the rest of their barn plans.
Ready to talk through your horse barns project in Philip?
Sources
- Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for horse barns specifically. (2026)
- https://www.charlestoncounty.org/departments/building-inspection-services/ (2026)
- Charleston County Zoning and Land Development Regulations, Sec. 3.8.2(D) (https://online.encodeplus.com/regs/charlestoncounty-sc/ereader/zldr) — a Zoning Permit is not required for one detached one-story accessory structure (tool/storage shed, playhouse, or similar) if the building footprint does not exceed 120 sq ft; this exemption applies to only one such structure per lot, and it covers the zoning permit specifically — garages and structures with electrical/plumbing typically still require a building permit regardless of size. (2026)
- Charleston County Zoning and Land Development Regulations, Sec. 3.8.2(D), https://online.encodeplus.com/regs/charlestoncounty-sc/ereader/zldr — needs direct lookup of the district-specific yard table (2026)
- Aggregated from windload.solutions and similar secondary sources — no single primary Charleston County wind-speed map document was retrieved (2026)
- Given/client spec — Charleston County is a coastal South Carolina county (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
Other Cities We Serve in Charleston County
See the Charleston County hub for horse barns
