Metal Garages in Murray Hills 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

Are you running out of room in the driveway, shed or workshop? A metal garage can put vehicles, tools and equipment under one roof. Benton Metal Depot supplies garage packages to customers in Murray Hills and across Richmond, with different building sizes depending on the amount of space the property owner needs.

Key Points

  • ◦The current local setback for a metal garage is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback)..
  • ◦Plan for door clearance and walking room when deciding how wide your garage needs to be.
  • ◦Check the permit and setback rules before deciding exactly where the garage will go.
  • ◦In Murray Hills, a building permit is required once the garage exceeds 120 square feet.
  • ◦Benton serves Belair, Bayvale, Westwick and Montclair and other communities around Murray Hills.

At a Glance

Permit threshold 120
As of 2026 · Source
Setback (side/rear) Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
As of 2026 · Source
Wind load zone Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
As of 2026 · Source
Drive time from Statesboro 104
As of 2026 · Source

Permits & Setbacks in Richmond County

The permit question for a Murray Hills metal garage comes down to one number from Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division: 120 square feet. Stay under it and skip the full permit process; either way, keep the Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback). setback in mind before you pick a spot.

Delivery to Murray Hills

Metal garage delivery to Murray Hills can take about 1 to 2 weeks. Use that time to take care of permits and get the site ready if work is needed beforehand. If you're hiring someone for grading or concrete, coordinate those jobs around the delivery schedule instead of trying to squeeze everything in at the last minute.

Metal garage by Benton Metal Depot

Representative product photo — a Richmond County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

How much extra room should I allow around my vehicles?

Don't measure a car and make the garage barely wider than the vehicle. You need enough room to open the doors, get in and out, walk around it and reach anything stored nearby. With two vehicles, remember the space between them too. Adding a little breathing room during planning can make a big difference once you use the garage every day.

Can I put a metal garage beside my house?

You may be able to, but don't assume every open spot on the property is buildable. Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division has requirements that can affect garage placement, including a current setback of Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).. Check the rules for your address before choosing the location, particularly if you're working with limited room between the house and property line.

Can I use my metal garage as a workshop too?

Definitely! Just plan for the workshop before deciding on the garage size. A workbench, toolboxes, shelving and equipment can eat up a lot of floor space, especially when you're also parking a vehicle inside. Make sure to give yourself enough room to work comfortably instead of trying to fit a workshop into whatever space happens to be left over.

Can I use a metal garage just for storage?

Yes. Cars don't have to be part of the equation at all. A metal garage can give you enclosed space for tools, lawn equipment, recreational gear and other belongings. If storage is the main purpose, think about shelving and aisle space while planning the building so everything remains accessible once the garage starts filling up.

Do I need a permit for a metal garage in Murray Hills?

That depends on the garage and the requirements of Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division. The current rule requires a permit once the garage exceeds 120 square feet. Check before doing any permanent site work. There may be other requirements tied to your property as well, so getting an answer early can save you from having to change plans later.

What can I keep in a metal garage?

Cars and trucks are obvious, but metal garages can also hold lawn equipment, tools, recreational gear and general storage. Larger buildings can leave room for work areas, too. Make a list of what you intend to keep inside before choosing the building size. It's easy to underestimate how quickly floor space disappears.

Can my metal garage have windows and different doors?

The available configuration depends on the garage package, but doors and windows should be considered while you're planning the layout. Think about where vehicles will enter, where you want a regular walk door and whether natural light is needed inside. Making those decisions early helps you choose a layout that works instead of adding features wherever they'll fit.

What do I need to do to my property before the garage arrives?

First, decide exactly where the garage will go and check the permit and setback requirements with Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division. Then follow the site requirements for the garage you've selected. Any grading, concrete or other preparation should be based on the final building specifications. Don't prepare the site using rough dimensions if the building hasn't been finalized.

Definitions

◦ Building Footprint
The amount of ground the garage takes up, based on its outside width and length.
◦ Roof Panel
A formed sheet of metal that makes up part of the garage's exterior roof surface.
◦ Ridge
The top line of a pitched roof where the two sloping sides come together.
◦ Setback
The required amount of space between your garage and a property line, road or another boundary covered by local rules.
◦ Gable
The triangular wall section found at the end of a building with a pitched roof.
◦ Overhead Door
The large door that opens upward to let cars, trucks or equipment move in and out of the garage.
◦ Building Permit
Approval from the local government to construct a building under the building and zoning rules that apply to the property.
◦ Roof Pitch
How steep the roof is, usually described by how much it rises over a set horizontal distance.
◦ Fastener
A screw or other connector used to hold metal panels and building components securely in place.
◦ Clear Span
Open floor space between the building's exterior supports without interior columns getting in the way.

Murray Hills, Richmond County — At a Glance

Permit Authority Name
Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division
Permit Authority Url
https://www.augustaga.gov/2101/Building-Permits
Permit Threshold Sqft
120
Setback Feet Side Rear
Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
Wind Load Zone
Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
Coastal
Drive Miles
81.2
Drive Minutes
104
Nearby Towns
Belair, Bayvale, Westwick, Montclair
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib panels -- Benton's existing standard gauge/profile for pole-barn, carport, and agricultural structures.
Color Count
7

Why Benton Metal Depot

Buying a garage isn't just a matter of picking a picture and choosing a size. You also have to think about what you're putting inside, where it will sit and what materials the project needs. Benton Metal Depot works with residents in Murray Hills and throughout the region to help them choose a garage package that will work well with whatever they need.

Ready to talk through your metal garages project in Murray Hills?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (pole-barns / agricultural-pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for metal garages. (2026)
  3. https://www.augustaga.gov/2099/Building-Construction (2026)
  4. https://www.augustaga.gov/2101/Building-Permits (2026)
  5. Secondary source (permitsguide.com/shed/georgia) states "one-story detached accessory structures used as tool and storage sheds not exceeding 120 square feet do not require a permit" in Augusta-Richmond County — NOT independently confirmed against the primary zoning ordinance PDF at https://www.augustaga.gov/DocumentCenter/View/8388; verify before publishing. (2026)
  6. Comprehensive Zoning Ordinance of Augusta-Richmond County, Section 8-4(a)/(b), as summarized at https://www.zoneomics.com/code/augusta-GA/chapter_10 — verify against primary PDF at https://www.augustaga.gov/DocumentCenter/View/8388 (2026)
  7. https://oci.georgia.gov/inspections-permits-plans/manufactured-housing/wind-zones (confirms Richmond County is not one of the 6 GA Wind Zone 2 coastal counties; Georgia has no Wind Zone 3) — general ASCE 7 range aggregated from windload.solutions (2026)
  8. Richmond County is inland (Augusta, on the Savannah River but ~120 miles from the coast) and is not among the coastal counties named in the client spec (2026)
  9. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  10. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  11. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  12. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.