Reviewed by the Benton Metal Depot team · Updated
A boat or camper is a big investment and storing it under a flimsy tarp doesn't give it enough protection. It's only smart to get a stronger, permanent cover to keep it safe. Benton Metal Depot supplies roofing materials for these structures throughout Aiken. Customers in Sunny Brook can choose from 7 available colors, with current material lead time of 1 to 2 weeks.
Key Points
- ◦In Sunny Brook, a permit from Aiken County Planning and Development Department (Building Codes/Inspections Division) is required once the cover exceeds 200 square feet.
- ◦Current material lead time for RV and boat covers to Sunny Brook is 1 to 2 weeks.
- ◦Benton Metal Depot is approximately 102 miles from Sunny Brook.
- ◦The current setback for an RV or boat cover in Sunny Brook is Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number..
- ◦Applicable cover roofing packages use 29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures. metal panels.
At a Glance
| Permit threshold |
200
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number.
As of 2026 · Source |
| Wind load zone |
Inland South Carolina (Aiken borders Augusta, GA, well away from the coast) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition Aiken County has adopted and must be confirmed with an SC-licensed engineer or the county building official.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures.
As of 2026 · Source |
| Drive time from Statesboro |
137
As of 2026 · Source |
Permits & Setbacks in Aiken County
Confirm the permit requirements first before buying materials or preparing the ground. The current permit threshold for an RV or boat cover in Sunny Brook is 200 square feet, with a setback of Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number.. Those requirements are administered by Aiken County Planning and Development Department (Building Codes/Inspections Division). Height limits, wind-load requirements and other restrictions may also apply, so confirm the rules for your particular property before choosing the final location and specifications.
Delivery to Sunny Brook
Once you've chosen the cover dimensions, use the lead time to get the site ready. Current material lead time for RV and boat covers to Sunny Brook is 1 to 2 weeks. That gives you time to handle permits, prepare the location and coordinate any concrete or anchoring work. Confirm the actual delivery schedule before arranging contractors or other parts of the project.
Representative product photo — a Aiken County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
Should I choose an open-sided or partially enclosed cover?
An open-sided cover usually makes parking and access easier, while partial walls may reduce exposure from certain directions. The tradeoff is that additional walls can affect airflow, maneuvering space and wind loads. Think about the weather your property gets and how often you'll move the vehicle before deciding which arrangement makes the most sense.
How long does delivery take for RV and boat cover materials?
Current lead time to Sunny Brook is approximately 1 to 2 weeks. Confirm when that period begins for your specific order. Use the schedule to arrange permits, site preparation and contractors without assuming the materials will arrive immediately after ordering.
What kind of metal panels does Benton use for RV and boat covers?
Benton supplies Rib and Snaplock roofing panels for carport-style structures, including RV and boat shelters. The applicable project specification is 29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures.. Rib panels use exposed fasteners, while Snaplock systems have a concealed-fastener appearance. The appropriate choice depends on the roof design, structural requirements and budget, not just how the panels look.
How tall should an RV cover be?
Measure your RV from the ground to its highest fixed point, including rooftop air conditioners, antennas or other equipment. Then allow additional clearance for entering and leaving the cover. The exact height should also account for the roof structure and any slope in the parking surface. Don't rely only on the manufacturer's listed vehicle height.
Can an RV or boat cover be installed on gravel?
A gravel parking area may be suitable for some cover designs, but the structure still needs a foundation and anchoring system appropriate for the site and applicable loads. Don't assume gravel alone is enough to secure it. The building designer or installer should determine the requirements based on soil conditions, wind exposure and the selected structure.
How close can an RV or boat cover be to my property line?
The current setback in Sunny Brook is Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number., subject to the requirements of Aiken County Planning and Development Department (Building Codes/Inspections Division) and your particular property. The roof overhang may also matter when measuring clearances. Confirm how the setback is calculated before marking the location, particularly if you're trying to fit the cover into a narrow side yard or driveway.
Will an RV cover protect my motorhome from the sun and rain?
A metal roof can reduce direct exposure to sunlight and rainfall, particularly over the RV's roof and upper surfaces. An open-sided cover won't keep out every bit of weather, though. Wind-driven rain, low-angle sunlight and blowing debris can still reach the vehicle. The amount of protection depends on the roof dimensions, height and surrounding conditions.
How wide should a boat cover be?
Start with the boat and trailer's widest point, then leave room for maneuvering and access. Don't measure the hull alone. Trailer fenders, guide posts and other attachments can extend farther out. You also need to consider where the support posts will sit so they don't make backing the boat into place unnecessarily difficult.
Definitions
- ◦ Setback
- The minimum required distance between a structure and a property boundary, road or other regulated feature.
- ◦ Snaplock Panel
- A standing seam roofing panel designed with interlocking raised seams and concealed fastening details.
- ◦ Roof Pitch
- The slope of the roof, measured by how much it rises over a given horizontal distance.
- ◦ Carport
- An open or partially enclosed structure with a roof designed to shelter vehicles, boats or equipment.
- ◦ Rib Panel
- A metal roofing panel with raised ribs that add stiffness and channel water down the roof. These panels commonly use exposed fasteners.
- ◦ Eave Height
- The height at the lower edge of the roof where it meets the supporting structure. This may differ from the usable clearance beneath the roof.
- ◦ Anchoring System
- The components used to secure the structure to its foundation or the ground in accordance with the approved design.
- ◦ Support Post
- A vertical structural member that carries roof loads down into the foundation or anchoring system.
- ◦ Vertical Clearance
- The usable height beneath the structure that determines whether an RV, boat or other vehicle can pass underneath without hitting anything.
- ◦ Panel Gauge
- A designation related to the thickness of sheet metal.
Sunny Brook, Aiken County — At a Glance
- Permit Authority Name
- Aiken County Planning and Development Department (Building Codes/Inspections Division)
- Permit Authority Url
- https://www.aikencountysc.gov/forms/pnd_buildingpermit.pdf
- Permit Threshold Sqft
- 200
- Setback Feet Side Rear
- Per Aiken County Code of Ordinances Ch. 24, Art. VIII: on parcels under 2 acres, total accessory-building floor area may not exceed 50% of the principal structure's gross floor area; accessory buildings in a required setback area are capped at 12 ft in height (20 ft if outside the setback area). Exact side/rear setback distances for freestanding detached accessory buildings by individual zoning district were not fully extracted — verify against the primary ordinance before publishing a specific district-by-district number.
- Wind Load Zone
- Inland South Carolina (Aiken borders Augusta, GA, well away from the coast) — roughly 105-120 mph (ASCE 7, Exposure C). NOT a verified figure; exact design wind speed depends on the ASCE 7/IBC edition Aiken County has adopted and must be confirmed with an SC-licensed engineer or the county building official.
- Coastal
- Drive Miles
- 102
- Drive Minutes
- 137
- Nearby Towns
- Eureka, Vaucluse, Rainbow Falls, Midland Valley
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures.
- Color Count
- 7
Why Benton Metal Depot
Benton Metal Depot has manufactured metal roofing products in Statesboro since 2004 and supplies materials for residential, commercial and agricultural projects. For an RV or boat cover in Sunny Brook, customers can work with a regional manufacturer that supplies Rib and Snaplock roofing panels used on open-sided shelters. Benton can help determine the roofing materials needed for the project's dimensions and specifications.
Ready to talk through your rv and boat covers project in Sunny Brook?
Sources
- Internal: category-data.php (carports / pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for RV and boat covers specifically. (2026)
- https://www.aikencountysc.gov/forms/pnd_buildingpermit.pdf (2026)
- Aiken County Planning & Development FAQ ("If the structure is over 200 square feet, then a building permit is required. If the structure is under 200 square feet, no permit is required.") — https://www.aikencountysc.gov/Faq.aspx?TID=24 — consistent with SC Residential Code § R105.2 statewide default (2026)
- https://library.municode.com/sc/aiken_county/codes/code_of_ordinances?nodeId=PTIICOOR_CH24LAMARE_ARTVIIIGEANRE (2026)
- General ASCE 7 inland-SC range (aggregated secondary sources) — no county-specific or primary map source found (2026)
- Aiken County is deep inland (western SC, on the GA border near Augusta) and is not among the coastal counties named in the client spec (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
Other Cities We Serve in Aiken County
See the Aiken County hub for rv and boat covers