RV and Boat Covers in Bashan 2026 | Benton Metal Depot

Reviewed by the Benton Metal Depot team · Updated

Do you need a safe area to park your RV or boat in Bashan so you're not leaving it out in the weather? A metal cover puts a roof over your investment while also making it easy to access. Benton Metal Depot supplies metal roofing materials for RV and boat shelters throughout Jasper, with different sizes and configurations to consider.

Key Points

  • ◦Boat cover dimensions should account for the trailer, motor and anything extending beyond the hull.
  • ◦In Bashan, a permit from Jasper County Planning and Building Services Department is required once the cover exceeds 200 square feet.
  • ◦Current material lead time for RV and boat covers to Bashan is 1 to 2 weeks.
  • ◦Open-sided covers provide overhead shelter but don't eliminate exposure to wind-driven rain.
  • ◦Applicable cover roofing packages use 29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures. metal panels.

At a Glance

Permit threshold 200
As of 2026 · Source
Setback (side/rear) Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
As of 2026 · Source
Wind load zone Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
As of 2026 · Source
Panel type/gauge 29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures.
As of 2026 · Source
Drive time from Statesboro 93
As of 2026 · Source

Permits & Setbacks in Jasper County

Confirm the permit requirements first before buying materials or preparing the ground. The current permit threshold for an RV or boat cover in Bashan is 200 square feet, with a setback of Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).. Those requirements are administered by Jasper County Planning and Building Services Department. Height limits, wind-load requirements and other restrictions may also apply, so confirm the rules for your particular property before choosing the final location and specifications.

Delivery to Bashan

Think about delivery while you're planning the project, not after everything else is decided. Current lead time is 1 to 2 weeks, with delivery to Bashan estimated within that window. Benton also serves nearby communities including Grahamville, Mitchellville, Jasper and Old House. Before materials arrive, make sure the site is accessible and any required permits or preparation have been handled.

Metal RV and boat cover by Benton Metal Depot

Representative product photo — a Jasper County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).

FAQ

Will an RV cover protect my motorhome from the sun and rain?

A metal roof can reduce direct exposure to sunlight and rainfall, particularly over the RV's roof and upper surfaces. An open-sided cover won't keep out every bit of weather, though. Wind-driven rain, low-angle sunlight and blowing debris can still reach the vehicle. The amount of protection depends on the roof dimensions, height and surrounding conditions.

How close can an RV or boat cover be to my property line?

The current setback in Bashan is Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650)., subject to the requirements of Jasper County Planning and Building Services Department and your particular property. The roof overhang may also matter when measuring clearances. Confirm how the setback is calculated before marking the location, particularly if you're trying to fit the cover into a narrow side yard or driveway.

Can an RV or boat cover be installed on gravel?

A gravel parking area may be suitable for some cover designs, but the structure still needs a foundation and anchoring system appropriate for the site and applicable loads. Don't assume gravel alone is enough to secure it. The building designer or installer should determine the requirements based on soil conditions, wind exposure and the selected structure.

Should I choose an open-sided or partially enclosed cover?

An open-sided cover usually makes parking and access easier, while partial walls may reduce exposure from certain directions. The tradeoff is that additional walls can affect airflow, maneuvering space and wind loads. Think about the weather your property gets and how often you'll move the vehicle before deciding which arrangement makes the most sense.

How many colors are available for an RV or boat cover?

Benton has 7 colors available for applicable RV and boat cover roofing projects. You might want the roof to match your house or another building, or simply choose a finish that suits the property. Confirm which colors are available for the selected panel profile and gauge before placing the material order.

Do I need a permit for an RV or boat cover in Bashan?

The requirements for Bashan are handled by Jasper County Planning and Building Services Department. Currently, a permit is required once the structure exceeds 200 square feet. Even an open-sided cover may be subject to building rules, setbacks or zoning restrictions. Check the requirements before preparing the site, especially if the structure will be placed near a property boundary or existing building.

How long does delivery take for RV and boat cover materials?

Current lead time to Bashan is approximately 1 to 2 weeks. Confirm when that period begins for your specific order. Use the schedule to arrange permits, site preparation and contractors without assuming the materials will arrive immediately after ordering.

How do I prepare my property for an RV or boat cover?

First, check that the location has enough room for the cover and for getting the vehicle in and out. Confirm local permits and setbacks with Jasper County Planning and Building Services Department. Then address grading, drainage, access and the foundation or anchoring requirements for the design. The site should be planned around the final dimensions, not an estimated footprint.

Definitions

◦ Snaplock Panel
A standing seam roofing panel designed with interlocking raised seams and concealed fastening details.
◦ Carport
An open or partially enclosed structure with a roof designed to shelter vehicles, boats or equipment.
◦ Roof Pitch
The slope of the roof, measured by how much it rises over a given horizontal distance.
◦ Wind Load
The force wind places on a structure, including uplift and pressure that the roof, framing and anchoring must resist.
◦ Lead Time
The period needed to process and prepare the ordered materials before the next stage of fulfillment.
◦ Building Permit
Approval from the relevant local authority to construct a structure under the applicable building and zoning requirements.
◦ Panel Gauge
A designation related to the thickness of sheet metal.
◦ Rib Panel
A metal roofing panel with raised ribs that add stiffness and channel water down the roof. These panels commonly use exposed fasteners.
◦ Eave Height
The height at the lower edge of the roof where it meets the supporting structure. This may differ from the usable clearance beneath the roof.
◦ Vertical Clearance
The usable height beneath the structure that determines whether an RV, boat or other vehicle can pass underneath without hitting anything.

Bashan, Jasper County — At a Glance

Permit Authority Name
Jasper County Planning and Building Services Department
Permit Authority Url
https://www.jaspercountysc.gov/services/planning-and-building/
Permit Threshold Sqft
200
Setback Feet Side Rear
Not confirmed — Jasper County Code Title 20 (Zoning) contains a district-by-district setback table but exact figures were not extractable via search. Needs direct confirmation with Planning and Building Services (843-717-3650).
Wind Load Zone
Coastal/near-coastal South Carolina — secondary sources place Jasper County in a Coastal High Hazard range of roughly 130-150 mph (ASCE 7-16, 3-second gust), likely tapering toward the lower end moving inland from the coast toward Ridgeland/Hardeeville. This is NOT a verified county-specific figure — South Carolina jurisdictions may reference ASCE 7-10 or ASCE 7-16 depending on local adoption, and the exact design wind speed for a given parcel must be confirmed with a SC-licensed engineer, the ATC Hazards by Location tool, or the county building official before publishing.
Coastal
1
Drive Miles
79
Drive Minutes
93
Nearby Towns
Grahamville, Mitchellville, Jasper, Old House
Delivery Weeks In Stock
1
Delivery Weeks Custom
2
Panel Type Gauge
29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures.
Color Count
7

Why Benton Metal Depot

Benton Metal Depot has manufactured metal roofing products in Statesboro since 2004 and supplies materials for residential, commercial and agricultural projects. For an RV or boat cover in Bashan, customers can work with a regional manufacturer that supplies Rib and Snaplock roofing panels used on open-sided shelters. Benton can help determine the roofing materials needed for the project's dimensions and specifications.

Ready to talk through your rv and boat covers project in Bashan?

Call (912) 489-5795

Sources

  1. Internal: category-data.php (carports / pole-barns copy) (2026)
  2. color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for RV and boat covers specifically. (2026)
  3. https://www.jaspercountysc.gov/services/planning-and-building/ (2026)
  4. Jasper County Code § 20.90.060 (Improvement Location Permit), as cited by https://jasper.county.codes/JCC/20.90.060 and summarized by secondary sources: "residential accessory structures less than 200 square feet, commercial accessory structures less than 120 square feet" are exempt from a building permit (zoning/setback compliance still required). Verify against the primary code text directly. (2026)
  5. https://www.jaspercountysc.gov/services/planning-and-building/ordinances-regulations/ (2026)
  6. Aggregated from windload.solutions (South Carolina Wind Load Requirements) and general ASCE 7-16 coastal SC guidance — no Jasper County-specific primary map source found (2026)
  7. Given/client spec — Jasper County, SC is a coastal county (2026)
  8. Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
  9. Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
  10. Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
  11. Bulk-set via dev-fact-review.php (2026)
Call Design

Get Your Free Metal Building Quote

Tell us a bit about your project and we'll get back to you with a custom quote — no obligation, no pressure.