Reviewed by the Benton Metal Depot team · Updated
Keeping a camper or boat outside year-round means it's exposed to the sun, rain and even falling debris. A metal roof can help reduce that exposure without fully enclosing the vehicle. Benton Metal Depot supplies roofing panels for RV and boat covers in Southlands and surrounding communities, including 29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures. panels for applicable projects.
Key Points
- ◦Current material lead time for RV and boat covers to Southlands is 1 to 2 weeks.
- ◦Benton Metal Depot is approximately 74.3 miles from Southlands.
- ◦In Southlands, a permit from Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division is required once the cover exceeds 120 square feet.
- ◦Measure the RV's full height, including rooftop equipment, before choosing roof clearance.
- ◦Benton has 7 available exterior colors for applicable cover projects.
At a Glance
| Permit threshold |
120
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
As of 2026 · Source |
| Wind load zone |
Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures.
As of 2026 · Source |
| Drive time from Statesboro |
96
As of 2026 · Source |
Permits & Setbacks in Richmond County
Confirm the permit requirements first before buying materials or preparing the ground. The current permit threshold for an RV or boat cover in Southlands is 120 square feet, with a setback of Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).. Those requirements are administered by Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division. Height limits, wind-load requirements and other restrictions may also apply, so confirm the rules for your particular property before choosing the final location and specifications.
Delivery to Southlands
Once you've chosen the cover dimensions, use the lead time to get the site ready. Current material lead time for RV and boat covers to Southlands is 1 to 2 weeks. That gives you time to handle permits, prepare the location and coordinate any concrete or anchoring work. Confirm the actual delivery schedule before arranging contractors or other parts of the project.
Representative product photo — a Richmond County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
What kind of metal panels does Benton use for RV and boat covers?
Benton supplies Rib and Snaplock roofing panels for carport-style structures, including RV and boat shelters. The applicable project specification is 29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures.. Rib panels use exposed fasteners, while Snaplock systems have a concealed-fastener appearance. The appropriate choice depends on the roof design, structural requirements and budget, not just how the panels look.
How tall should an RV cover be?
Measure your RV from the ground to its highest fixed point, including rooftop air conditioners, antennas or other equipment. Then allow additional clearance for entering and leaving the cover. The exact height should also account for the roof structure and any slope in the parking surface. Don't rely only on the manufacturer's listed vehicle height.
Can an RV or boat cover be installed on gravel?
A gravel parking area may be suitable for some cover designs, but the structure still needs a foundation and anchoring system appropriate for the site and applicable loads. Don't assume gravel alone is enough to secure it. The building designer or installer should determine the requirements based on soil conditions, wind exposure and the selected structure.
Should I choose an open-sided or partially enclosed cover?
An open-sided cover usually makes parking and access easier, while partial walls may reduce exposure from certain directions. The tradeoff is that additional walls can affect airflow, maneuvering space and wind loads. Think about the weather your property gets and how often you'll move the vehicle before deciding which arrangement makes the most sense.
How long does delivery take for RV and boat cover materials?
Current lead time to Southlands is approximately 1 to 2 weeks. Confirm when that period begins for your specific order. Use the schedule to arrange permits, site preparation and contractors without assuming the materials will arrive immediately after ordering.
Can I use the same metal cover for an RV and a boat?
Possibly, as long as the structure is sized for whichever vehicle needs the most clearance. Measure both carefully, including the boat trailer, motor and RV rooftop equipment. Think about how each will enter and leave the space, too. A cover that works for one vehicle may have inconvenient support-post spacing or insufficient height for the other.
How do I prepare my property for an RV or boat cover?
First, check that the location has enough room for the cover and for getting the vehicle in and out. Confirm local permits and setbacks with Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division. Then address grading, drainage, access and the foundation or anchoring requirements for the design. The site should be planned around the final dimensions, not an estimated footprint.
Do I need a permit for an RV or boat cover in Southlands?
The requirements for Southlands are handled by Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division. Currently, a permit is required once the structure exceeds 120 square feet. Even an open-sided cover may be subject to building rules, setbacks or zoning restrictions. Check the requirements before preparing the site, especially if the structure will be placed near a property boundary or existing building.
Definitions
- ◦ Roof Pitch
- The slope of the roof, measured by how much it rises over a given horizontal distance.
- ◦ Carport
- An open or partially enclosed structure with a roof designed to shelter vehicles, boats or equipment.
- ◦ Snaplock Panel
- A standing seam roofing panel designed with interlocking raised seams and concealed fastening details.
- ◦ Setback
- The minimum required distance between a structure and a property boundary, road or other regulated feature.
- ◦ Eave Height
- The height at the lower edge of the roof where it meets the supporting structure. This may differ from the usable clearance beneath the roof.
- ◦ Anchoring System
- The components used to secure the structure to its foundation or the ground in accordance with the approved design.
- ◦ Rib Panel
- A metal roofing panel with raised ribs that add stiffness and channel water down the roof. These panels commonly use exposed fasteners.
- ◦ Panel Gauge
- A designation related to the thickness of sheet metal.
- ◦ Building Permit
- Approval from the relevant local authority to construct a structure under the applicable building and zoning requirements.
- ◦ Support Post
- A vertical structural member that carries roof loads down into the foundation or anchoring system.
Southlands, Richmond County — At a Glance
- Permit Authority Name
- Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division
- Permit Authority Url
- https://www.augustaga.gov/2101/Building-Permits
- Permit Threshold Sqft
- 120
- Setback Feet Side Rear
- Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
- Wind Load Zone
- Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
- Coastal
- Drive Miles
- 74.3
- Drive Minutes
- 96
- Nearby Towns
- Mechanic Hill, Neco, Westover, Tahoma
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures.
- Color Count
- 7
Why Benton Metal Depot
Benton Metal Depot has served contractors and property owners from Statesboro since 2004. The company manufactures metal roofing panels and uses a single-source coil supplier to help maintain consistent finishes. For RV and boat cover projects in Southlands, Benton can supply applicable roofing materials cut to the specifications of the planned structure.
Ready to talk through your rv and boat covers project in Southlands?
Sources
- Internal: category-data.php (carports / pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for RV and boat covers specifically. (2026)
- https://www.augustaga.gov/2099/Building-Construction (2026)
- https://www.augustaga.gov/2101/Building-Permits (2026)
- Secondary source (permitsguide.com/shed/georgia) states "one-story detached accessory structures used as tool and storage sheds not exceeding 120 square feet do not require a permit" in Augusta-Richmond County — NOT independently confirmed against the primary zoning ordinance PDF at https://www.augustaga.gov/DocumentCenter/View/8388; verify before publishing. (2026)
- Comprehensive Zoning Ordinance of Augusta-Richmond County, Section 8-4(a)/(b), as summarized at https://www.zoneomics.com/code/augusta-GA/chapter_10 — verify against primary PDF at https://www.augustaga.gov/DocumentCenter/View/8388 (2026)
- https://oci.georgia.gov/inspections-permits-plans/manufactured-housing/wind-zones (confirms Richmond County is not one of the 6 GA Wind Zone 2 coastal counties; Georgia has no Wind Zone 3) — general ASCE 7 range aggregated from windload.solutions (2026)
- Richmond County is inland (Augusta, on the Savannah River but ~120 miles from the coast) and is not among the coastal counties named in the client spec (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
