Reviewed by the Benton Metal Depot team · Updated
If you're thinking of getting a boat or RV cover, there are a few things to consider. You want enough clearance to park comfortably without worrying about the roof, support posts or trailer. Benton Metal Depot supplies metal panels for recreational vehicle shelters throughout Richmond, serving property owners in Westover and nearby communities.
Key Points
- ◦Current material lead time for RV and boat covers to Westover is 1 to 2 weeks.
- ◦Open-sided covers provide overhead shelter but don't eliminate exposure to wind-driven rain.
- ◦Boat cover dimensions should account for the trailer, motor and anything extending beyond the hull.
- ◦In Westover, a permit from Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division is required once the cover exceeds 120 square feet.
- ◦Benton Metal Depot is approximately 74.3 miles from Westover.
At a Glance
| Permit threshold |
120
As of 2026 · Source |
|---|---|
| Setback (side/rear) |
Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
As of 2026 · Source |
| Wind load zone |
Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
As of 2026 · Source |
| Panel type/gauge |
29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures.
As of 2026 · Source |
| Drive time from Statesboro |
96
As of 2026 · Source |
Permits & Setbacks in Richmond County
Check where you're allowed to put the cover before you decide how large it should be. For an RV or boat cover in Westover, a permit is required once the structure exceeds 120 square feet, and the current setback is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).. Confirm those requirements with Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division, especially if the cover will be beside your house, near a driveway or close to a property line. An open structure isn't automatically exempt from local rules.
Delivery to Westover
Delivery goes more smoothly when you've already figured out where the materials will be unloaded. RV and boat cover roofing materials for Westover currently have a lead time of 1 to 2 weeks. Benton Metal Depot is approximately 74.3 miles away. Make sure the property is accessible and that there's a suitable place to receive and store the materials until installation.
Representative product photo — a Richmond County-specific project photo is pending (rotates in from Trey's weekly upload per the freshness cadence).
FAQ
How many colors are available for an RV or boat cover?
Benton has 7 colors available for applicable RV and boat cover roofing projects. You might want the roof to match your house or another building, or simply choose a finish that suits the property. Confirm which colors are available for the selected panel profile and gauge before placing the material order.
Can an RV or boat cover be installed on gravel?
A gravel parking area may be suitable for some cover designs, but the structure still needs a foundation and anchoring system appropriate for the site and applicable loads. Don't assume gravel alone is enough to secure it. The building designer or installer should determine the requirements based on soil conditions, wind exposure and the selected structure.
Do I need a permit for an RV or boat cover in Westover?
The requirements for Westover are handled by Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division. Currently, a permit is required once the structure exceeds 120 square feet. Even an open-sided cover may be subject to building rules, setbacks or zoning restrictions. Check the requirements before preparing the site, especially if the structure will be placed near a property boundary or existing building.
Should I choose an open-sided or partially enclosed cover?
An open-sided cover usually makes parking and access easier, while partial walls may reduce exposure from certain directions. The tradeoff is that additional walls can affect airflow, maneuvering space and wind loads. Think about the weather your property gets and how often you'll move the vehicle before deciding which arrangement makes the most sense.
Will an RV cover protect my motorhome from the sun and rain?
A metal roof can reduce direct exposure to sunlight and rainfall, particularly over the RV's roof and upper surfaces. An open-sided cover won't keep out every bit of weather, though. Wind-driven rain, low-angle sunlight and blowing debris can still reach the vehicle. The amount of protection depends on the roof dimensions, height and surrounding conditions.
How close can an RV or boat cover be to my property line?
The current setback in Westover is Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback)., subject to the requirements of Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division and your particular property. The roof overhang may also matter when measuring clearances. Confirm how the setback is calculated before marking the location, particularly if you're trying to fit the cover into a narrow side yard or driveway.
What kind of metal panels does Benton use for RV and boat covers?
Benton supplies Rib and Snaplock roofing panels for carport-style structures, including RV and boat shelters. The applicable project specification is 29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures.. Rib panels use exposed fasteners, while Snaplock systems have a concealed-fastener appearance. The appropriate choice depends on the roof design, structural requirements and budget, not just how the panels look.
How tall should an RV cover be?
Measure your RV from the ground to its highest fixed point, including rooftop air conditioners, antennas or other equipment. Then allow additional clearance for entering and leaving the cover. The exact height should also account for the roof structure and any slope in the parking surface. Don't rely only on the manufacturer's listed vehicle height.
Definitions
- ◦ Snaplock Panel
- A standing seam roofing panel designed with interlocking raised seams and concealed fastening details.
- ◦ Roof Pitch
- The slope of the roof, measured by how much it rises over a given horizontal distance.
- ◦ Carport
- An open or partially enclosed structure with a roof designed to shelter vehicles, boats or equipment.
- ◦ Setback
- The minimum required distance between a structure and a property boundary, road or other regulated feature.
- ◦ Anchoring System
- The components used to secure the structure to its foundation or the ground in accordance with the approved design.
- ◦ Rib Panel
- A metal roofing panel with raised ribs that add stiffness and channel water down the roof. These panels commonly use exposed fasteners.
- ◦ Eave Height
- The height at the lower edge of the roof where it meets the supporting structure. This may differ from the usable clearance beneath the roof.
- ◦ Support Post
- A vertical structural member that carries roof loads down into the foundation or anchoring system.
- ◦ Vertical Clearance
- The usable height beneath the structure that determines whether an RV, boat or other vehicle can pass underneath without hitting anything.
- ◦ Panel Gauge
- A designation related to the thickness of sheet metal.
Westover, Richmond County — At a Glance
- Permit Authority Name
- Augusta-Richmond County Planning & Development Department, License & Inspection / Construction Division
- Permit Authority Url
- https://www.augustaga.gov/2101/Building-Permits
- Permit Threshold Sqft
- 120
- Setback Feet Side Rear
- Rear: minimum 10 ft (including eaves/overhangs) for all accessory buildings. Side: same as required for the principal structure — 5 ft each side on lots ≤55 ft wide, 7 ft on lots 56-70 ft wide, 10 ft on lots >70 ft wide. Accessory buildings generally barred from front yards (except carports/garages, which must meet the principal-structure front setback).
- Wind Load Zone
- Inland Georgia, Wind Zone 1 per Georgia Dept. of Insurance/Safety Fire — roughly 115-120 mph (ASCE 7, Exposure C). Exact design wind speed depends on which ASCE 7 edition Richmond County/Augusta has adopted and must be confirmed with a GA-licensed engineer or the county building official.
- Coastal
- Drive Miles
- 74.3
- Drive Minutes
- 96
- Nearby Towns
- Mechanic Hill, Neco, Southlands, Tahoma
- Delivery Weeks In Stock
- 1
- Delivery Weeks Custom
- 2
- Panel Type Gauge
- 29-gauge and 26-gauge Rib and Snaplock panels -- Benton's existing standard gauge/profile for carport-style, open-sided structures.
- Color Count
- 7
Why Benton Metal Depot
A cover for a boat or motorhome needs to do more than look good from the driveway. The roof has to suit the structure, and the dimensions need to account for what will be parked underneath. Benton Metal Depot supplies metal roofing panels, trim and related accessories, helping customers and contractors put together the material list for their cover projects.
Ready to talk through your rv and boat covers project in Westover?
Sources
- Internal: category-data.php (carports / pole-barns copy) (2026)
- color-collection.php Weather XL Rib/PBR color chart: Polar White, Pebble Gray, Granite, Onyx, Vanilla, Sand, Chocolate (29ga; 5 of the 7 also available in 26ga). Real Benton color count for this panel line -- not confirmed as the specific palette Jim/Trey intend to offer for RV and boat covers specifically. (2026)
- https://www.augustaga.gov/2099/Building-Construction (2026)
- https://www.augustaga.gov/2101/Building-Permits (2026)
- Secondary source (permitsguide.com/shed/georgia) states "one-story detached accessory structures used as tool and storage sheds not exceeding 120 square feet do not require a permit" in Augusta-Richmond County — NOT independently confirmed against the primary zoning ordinance PDF at https://www.augustaga.gov/DocumentCenter/View/8388; verify before publishing. (2026)
- Comprehensive Zoning Ordinance of Augusta-Richmond County, Section 8-4(a)/(b), as summarized at https://www.zoneomics.com/code/augusta-GA/chapter_10 — verify against primary PDF at https://www.augustaga.gov/DocumentCenter/View/8388 (2026)
- https://oci.georgia.gov/inspections-permits-plans/manufactured-housing/wind-zones (confirms Richmond County is not one of the 6 GA Wind Zone 2 coastal counties; Georgia has no Wind Zone 3) — general ASCE 7 range aggregated from windload.solutions (2026)
- Richmond County is inland (Augusta, on the Savannah River but ~120 miles from the coast) and is not among the coastal counties named in the client spec (2026)
- Computed 2026-09-16: GeoNames zip centroid -> OSRM public routing engine (real driving route from Statesboro, Bulloch County, GA). Deterministic and reproducible, but a free public demo routing server, not Google Maps -- spot-check a sample before confirming. (2026)
- Computed 2026-09-16: same OSRM routing result as drive_miles, converted from seconds. (2026)
- Computed 2026-09-16: 4 nearest cities in benton_service_area_cities.php by straight-line (haversine) distance from zip centroid. (2026)
- Bulk-set via dev-fact-review.php (2026)
